Back to docs
Why material specification is so hard today
Specification is one of the most time-consuming, error-prone parts of a designer's job. Here are the difficulties — and why they multiply across every material.
Specification is one of the most time-consuming and error-prone parts of a designer's job — and the tools haven't kept up.
- Fragmented suppliers. Product information lives across dozens of catalogues, PDFs, emails and phone calls. Finding the right product means hunting across all of them.
- Manual, repetitive work. The same details get re-typed into spreadsheets and documents again and again, by hand.
- No single source of truth. Versions drift between the drawing, the schedule and the supplier quote, and it is easy to lose track of who changed what.
- Slow turnaround. Assembling one coordinated schedule can take a week or two of back-and-forth.
- Compliance risk. Fire, accessibility and durability requirements are easy to miss when everything is manual.
Now multiply all of this across every material category in a project. Specification becomes a quiet drain on time, margin and confidence.
Ready to specify faster?
Start free